A spatial interpretation of the concept trust. The structure invites two people to balance along the two pathes 20 cm above ground.
As the paths diverge and the enclosing frames narrow in, they will need to lean against each other for support and stability. Constructed with 140m of 12mm steel rods and 3x30mm flat steel for connections.
2 days of planning. 3 days of construction. The project was a group effort by 4 students at Oslo School of Architecture and Design.